A product requires the following tasks to make it on an assembly line. Assume 7.6 hours per workday and 5 workdays per week.  Task‾ Time in seconds)‾ Predecessors ‾ A 10 none  B 14 A  C 12 none  D 8 none  E 11 C  F 17 C, D  G 20 B  H 9 E  I 13 D  J 15G,H K 17 H, I  L 8 J  M 10 M  N 15 K, L, M \begin{array}{ccc} \underline{\text { Task} } & \underline{ \text { Time in seconds)} } & \underline{ \text { Predecessors } }\\\text { A } & 10 & \text { none } \\\text { B } & 14 & \text { A } \\\text { C } & 12 & \text { none } \\\text { D } & 8 & \text { none } \\\text { E } & 11 & \text { C } \\\text { F } & 17 & \text { C, D } \\\text { G } & 20 & \text { B } \\\text { H } & 9 & \text { E } \\\text { I } & 13 & \text { D } \\\text { J } & 15 & \mathrm{G}, \mathrm{H} \\\text { K } & 17 & \text { H, I } \\\text { L } & 8 & \text { J } \\\text { M } & 10 & \text { M } \\\text { N } & 15 & \text { K, L, M }\end{array} a.Using only the information given, what would be the maximum output per day that can be achieved? b.Assume that the activities have been assigned to five workstations. What is the line efficiency for a cycle time of 40 seconds?

Correct Answer

verifed

verified

a.The minimum cycle time is the maximum ...

View Answer

Teams are a way of accomplishing job enrichment.

A) True
B) False

Correct Answer

verifed

verified

Because of precedence relationships, assembly-line efficiencies will generally be very high.

A) True
B) False

Correct Answer

verifed

verified

Which type of layout is best for high volumes of demand with few if any setups/changeovers?


A) Product
B) Process
C) Cellular
D) Fixed position

E) None of the above
F) A) and B)

Correct Answer

verifed

verified

Describe approaches used for process layout design.

Correct Answer

verifed

verified

In designing process layouts, we are con...

View Answer

Product layouts are less flexible than process layouts.

A) True
B) False

Correct Answer

verifed

verified

A ____ layout is an arrangement based on self-contained groups of equipment needed to produce a particular set of goods or services.


A) Product
B) Process
C) Cellular
D) Fixed position

E) A) and C)
F) C) and D)

Correct Answer

verifed

verified

Ergonomics is the science that is concerned with determining specific job tasks and responsibilities.

A) True
B) False

Correct Answer

verifed

verified

Discuss four reasons for conducting a facility-layout study.

Correct Answer

verifed

verified

Facility-layout studies are necessary wh...

View Answer

The facility layout in a library would most likely be a process layout.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is not a disadvantage of virtual teams?


A) Security
B) Working hours
C) Synchronizing calendars
D) Socialization

E) B) and C)
F) B) and D)

Correct Answer

verifed

verified

Cycle time in assembly line balancing is the maximum amount of time it takes to process a part at some workstation along the line.

A) True
B) False

Correct Answer

verifed

verified

An assembly line with 28 activities is to be balanced. The total amount of time required for all 28 activities is 39 minutes. The line will operate for 450 minutes per day. What must the cycle time be to achieve an output rate of 400 units/day?


A) 1.39 minutes
B) 11.54 minutes
C) 1.125 minutes
D) 0.89 minutes

E) A) and D)
F) A) and C)

Correct Answer

verifed

verified

List the many questions that must be addressed in designing a workstation.

Correct Answer

verifed

verified

1. Who will use the workplace- Will the ...

View Answer

Virtual teams are empowered work teams that assume many traditional management responsibilities.

A) True
B) False

Correct Answer

verifed

verified

Explain the socio-technical approach to job design and some ways to implement it.

Correct Answer

verifed

verified

The relationships between the technology...

View Answer

All of the following are true regarding assembly lines except


A) Lower cost
B) Only one model can be assembled on a line
C) Makes good affordable to mass markets
D) Used in services,
E) g., insurance policies and sorting mail

F) B) and C)
G) C) and D)

Correct Answer

verifed

verified

In a product layout such as an assembly line, a flow blocking delay occurs whenever one stage completes work and no units from the previous stage are waiting processing.

A) True
B) False

Correct Answer

verifed

verified

A ____ layout is an arrangement based on the sequence of operations that are performed during the manufacturing of a good or the delivery of a service.


A) Product
B) Process
C) Cellular
D) Fixed position

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Consider the following assembly line information for manufacturing the latest cell phone.  Task ‾ The in minutes)‾ Predecessars‾ A 0.5 none  B 0.4 A  C 0.6 A  D 0.2 B, C  E 0.3 B  F 0.7 E, D  G 0.4 F, C \begin{array} { c c c } \underline{\text { Task }} & \underline{ \text { The in minutes)} } & \underline{ \text { Predecessars} } \\\text { A } & 0.5 & \text { none } \\\text { B } & 0.4 & \text { A } \\\text { C } & 0.6 & \text { A } \\\text { D } & 0.2 & \text { B, C } \\\text { E } & 0.3 & \text { B } \\\text { F } & 0.7 & \text { E, D } \\\text { G } & 0.4 & \text { F, C }\end{array} The firm wants to produce 80 cell phones per hour. a.What is the required cycle time? b.Balance the assembly line using your choice of balancing heuristic, with the goal of minimizing the number of workstations needed? Specify the tasks) assigned to each workstation.) c.What is the efficiency of your assembly line? d.Is this a good assembly line balancing solution? Explain. What do you recommend?

Correct Answer

verifed

verified

a.CT = A/R = 60/80 = 0.75 minutes per ce...