A production line is to be designed to make 500 El-More dolls per day.Each doll requires 11 activities totaling 16 minutes of work.The factory operates 750 minutes per day.What is the required cycle time for this assembly line?


A) 0.5 minutes
B) 1.5 minutes
C) 2 minutes
D) 5,500 minutes
E) 4.26 minutes

F) A) and B)
G) B) and C)

Correct Answer

verifed

verified

________ is the maximum time that the product is allowed at each workstation.

Correct Answer

verifed

verified

Cross-docking processes items as they are received,rather than placing them in storage.

A) True
B) False

Correct Answer

verifed

verified

The project remains in one place and workers and equipment come to that one work area in a(n)________ layout.

Correct Answer

verifed

verified

Which type of layout features departments or other functional groupings in which similar activities are performed?


A) process-oriented
B) product-oriented
C) fixed-position
D) mass production
E) unit production

F) All of the above
G) A) and C)

Correct Answer

verifed

verified

The objective of layout strategy is to develop an effective and efficient layout that will meet the firm's competitive requirements.

A) True
B) False

Correct Answer

verifed

verified

The central problem in product-oriented layout planning is:


A) minimizing material handling within workstations.
B) minimizing labor movement between workstations.
C) equalizing the space allocated to the different workstations.
D) maximizing equipment utilization.
E) minimizing the imbalance in the workloads among workstations.

F) B) and D)
G) B) and C)

Correct Answer

verifed

verified

A focused work center is well suited to the production of a large family of products requiring similar processing,even if their demands are not very stable.

A) True
B) False

Correct Answer

verifed

verified

False

A good layout requires determining:


A) material handling equipment.
B) capacity and space requirements.
C) environment and aesthetics.
D) cost of moving between various work areas.
E) all of the above

F) A) and D)
G) D) and E)

Correct Answer

verifed

verified

E

Identify the five common layout heuristics used to assign tasks to workstations in assembly-line balancing.

Correct Answer

verifed

verified

(1)longest task (operation)tim...

View Answer

Process-oriented layouts typically have low levels of work-in-process inventory.

A) True
B) False

Correct Answer

verifed

verified

ASRS stands for which of the following?


A) automated storage and retrieval system
B) automated storage and recovery system
C) automated scan and recognize system
D) automated scan and retail system
E) automated scan and retrieval system

F) A) and B)
G) B) and D)

Correct Answer

verifed

verified

Which of the following is one of the main advantages of a product-oriented layout?


A) high customer exposure rates
B) employability of highly skilled labor
C) high flexibility
D) low capital cost
E) low variable cost per unit

F) B) and E)
G) All of the above

Correct Answer

verifed

verified

Which of the following is NOT a retail layout practice?


A) Locate the high-draw items around the periphery of the store.
B) Distribute power items throughout the store.
C) Use end-aisle locations to maximize product exposure.
D) Use prominent locations for high-impulse and high-margin items.
E) All of the above are retail layout practices.

F) A) and B)
G) B) and D)

Correct Answer

verifed

verified

The dominant problem associated with the fixed-position layout is that workers are fixed in position,and they cannot be reassigned.

A) True
B) False

Correct Answer

verifed

verified

A work cell is required to make 80 computerized diagnostic assemblies (for installation into hybrid automobiles)each day.The cell currently works an eight hour shift,of which seven hours are available for productive work.These assemblies require five operations,with times of 1.0,1.8,2.4,2.5,and 1.4 minutes each.(a)What is takt time for this cell? (b)How many workers will be needed?

Correct Answer

verifed

verified

(a)Takt time = 420 minutes / 8...

View Answer

Solving a load-distance problem for a process-oriented layout requires that:


A) the difficulty of movement be the same for all possible paths.
B) pickup and setdown costs vary from department to department.
C) the cost to move a load be the same for all possible paths.
D) takt time be less than 1.
E) Proplanner software examines all possible department configurations.

F) None of the above
G) D) and E)

Correct Answer

verifed

verified

If the schedule calls for the production of 120 units per day and 480 minutes of production time are available per day,the cycle time would be 4 minutes.

A) True
B) False

Correct Answer

verifed

verified

True

Which of the following is a common heuristic for assembly line balancing?


A) first come,first served
B) least preceding tasks
C) earliest due date first
D) ranked positional weight
E) most preceding tasks

F) C) and D)
G) A) and B)

Correct Answer

verifed

verified

One of the major advantages of process-oriented layouts is:


A) high equipment utilization.
B) large work-in-process inventories.
C) flexibility in equipment and labor assignment.
D) smooth and continuous flow of work.
E) small work-in-process inventories.

F) C) and E)
G) A) and B)

Correct Answer

verifed

verified