A) 0.5 minutes
B) 1.5 minutes
C) 2 minutes
D) 5,500 minutes
E) 4.26 minutes
Correct Answer
verified
Short Answer
Correct Answer
verified
True/False
Correct Answer
verified
Short Answer
Correct Answer
verified
Multiple Choice
A) process-oriented
B) product-oriented
C) fixed-position
D) mass production
E) unit production
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) minimizing material handling within workstations.
B) minimizing labor movement between workstations.
C) equalizing the space allocated to the different workstations.
D) maximizing equipment utilization.
E) minimizing the imbalance in the workloads among workstations.
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) material handling equipment.
B) capacity and space requirements.
C) environment and aesthetics.
D) cost of moving between various work areas.
E) all of the above
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
True/False
Correct Answer
verified
Multiple Choice
A) automated storage and retrieval system
B) automated storage and recovery system
C) automated scan and recognize system
D) automated scan and retail system
E) automated scan and retrieval system
Correct Answer
verified
Multiple Choice
A) high customer exposure rates
B) employability of highly skilled labor
C) high flexibility
D) low capital cost
E) low variable cost per unit
Correct Answer
verified
Multiple Choice
A) Locate the high-draw items around the periphery of the store.
B) Distribute power items throughout the store.
C) Use end-aisle locations to maximize product exposure.
D) Use prominent locations for high-impulse and high-margin items.
E) All of the above are retail layout practices.
Correct Answer
verified
True/False
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Multiple Choice
A) the difficulty of movement be the same for all possible paths.
B) pickup and setdown costs vary from department to department.
C) the cost to move a load be the same for all possible paths.
D) takt time be less than 1.
E) Proplanner software examines all possible department configurations.
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) first come,first served
B) least preceding tasks
C) earliest due date first
D) ranked positional weight
E) most preceding tasks
Correct Answer
verified
Multiple Choice
A) high equipment utilization.
B) large work-in-process inventories.
C) flexibility in equipment and labor assignment.
D) smooth and continuous flow of work.
E) small work-in-process inventories.
Correct Answer
verified
Showing 1 - 20 of 146